P-38 Electrical - Fuel Level Transmitter - Connect & Operate Work-Board, Operation Sheet No. 20, 24-Mar-1943
Operation Sheet No. 20
24-Mar-1943
To access this and thousands of other manuals, plus over 400,000 warbird engineering drawings!
No problem - Click below to purchase a digital download of this manual from our storefront!