Document Description

Project Guide for Power Plant Installation and Operation - Installation of R-2600-9 Engines and Mount Assemblies into the B-25 , 9-Oct-1941

Document Revision Date

9-Oct-1941

Already a Member?

Sign in to read this full document


Become a member

To access this and thousands of other manuals, plus over 400,000 warbird engineering drawings!

JOIN NOW


Don't want to join?

No problem - Click below to purchase a digital download of this manual from our storefront!

PURCHASE NOW

Sample Page: 1 of 2