P-38 Powerplant - Coolant System Draining & Refilling, Operation Sheet No. 19, 17-Sept-1943
Operation Sheet No. 19
17-Sept-1943
To access this and thousands of other manuals, plus over 400,000 warbird engineering drawings!
No problem - Click below to purchase a digital download of this manual from our storefront!