Inspection of Main Switch Box Assemblies for P-38G-10 and F5A-10
5-Dec-1943
T.O. No. 01-75-45
|
Modification of Carburetor Air Intake Duct Static Pressure Tubes for RP-38
17-June-1943
T.O. No. 01-75-17
|
Installation and Inspection of Turbosuperchargers
11-Dec-1943
T.O. No. 01-1-144
|
Addition of Oil Cooler Flap Operator Brace for RP-38E, F, H-1, RF-4 and F-5
20-Nov-1943
T.O. No. 01-75-15
|
Modification of Bomb Control and Cockpit Light Box Assembly for P-38E, P-38F, P-38G, and F-5
7-Feb-1943
T.O. No. 01-75-11
|
Servicing Coolant Systems
30-Dec-1944
T.O. No. 01-1-167
|
Inspection of Reverse Current Relay for P-38 Series, F-4, and F-5 Series
5-Dec-1942
T.O. No. 01-75F-68
|
Installation of Modified Type 0-1 Generators
26-July-1944
T.O. No. 01-1-190
|
Bomb Indicator Light Wiring Modification for P-38F, G, H, J, and F5
29-Nov-1943
T.O. No. 01-75-43
|
Installation of Doubler on Coolant Radiator Exit Flap for P-38J-1, -5, and F-5B-1
20-July-1944
T.O. No. 01-75-49
|
Installation of Inverter Switch for P-38F
11-Sept-1942
T.O. No. 01-75FB-25
|
Modification of Parking Brake Pawl Assembly for F-5A, P-38F, and G Series
28-Sept-1944
T.O. No. 01-75-27
|
Installation of Autosyn Thermometer Transmitters for P-38E, P-38F, and F-4
19-Aug-1942
T.O. No. 01-75F-64
|
Pressurization of Coolant System for P-38J-5, -10, -15, and F-5B-1
10-Aug-1944
T.O. No. 01-75-65
|
Inspection of Main Switch Box Assemblies for P-38G-10 and F5A-10
2-Sept-1943
T.O. No. 01-75F-28
|
Inspection and Reinforcement of Fuselage Bulkhead Part No. 245901 at Station 126 3/32 for RP-38
15-Dec-1943
T.O. No. 01-75-26
|
Installation of Asbestos on Plastic Conduit in Engine Nacelle for P-38J and P-38L
25-Aug-1944
T.O. No. 01-75FF-32
|
Inspection of Carburetors Installed on V-1710-27 and -29 Engines for the P-38 Series
7-Aug-1942
T.O. No. 01-75F-20
|
Modification of SCR-535-A Group A Parts Installation to Permit Use of Radio Set SCR-595-A or -695-A for P-38 Series
19-Feb-1943
T.O. No. 01-75-12
|
Addition of Stiffener to Inboard Web L-R Hand Forward Booms for Rp-38E, F, G, F-4, and F-5 Series
7-June-1943
T.O. No. 01-75-18
|
Addition of Filter to Coolant Radiator Control Valve Hydraulic Line for P-38G-10, -15, P-38J, and F-5A-10
26-Aug-1943
T.O. No. 01-75F-34
|
Servicing Coolant Systems
15-Dec-1943
T.O. No. 01-1-150
|
Modification of Exhaust System for P-38E, P-38F, P-38, F-4 and F-4A
29-Aug-1942
T.O. No. 01-75F-61
|
Installation of Condenser in Engine Junction Box for P-38G-10, P-38J-1, P-38H-1, and H-5
27-May-1944
T.O. No. 01-75F-95
|
Replacement of .50 Caliber Front Trunnion for RP-38E, P-38F, P-38G, and RP-322
10-Oct-1944
T.O. No. 01-75F-85
|
Wiring Aileron Booster Valve Off for P-38J-25 and P-38L-1
26-Oct-1944
T.O. No. 01-75FF-35
|
Installation of Microphone Adapter M-299 for P-38F, G, H, F-5, and F-5A
13-Aug-1943
T.O. No. 01-75-14
|
Installation of Carburetor Air Filters for P-38 Series
16-June-1943
T.O. No. 01-75-8
|
Inspection of Engine Nacelle Plumbing Lines for P-38F, F-4, and F-5 Series
24-May-1943
T.O. No. 01-75-21
|
Modification of .50 Caliber Ammunition Tray for RP-38E and Subsequent
3-Aug-1943
T.O. No. 01-75F-6
|
Inspection of Fuel and Oil Dilution System Accessories for Drilled AN913-1 and -1D Plug for P-38H, J, F-4, and F-5 Series
14-Feb-1944
T.O. No. 01-75-51
|
Rework of Caliber .50 Gun Barrel Cover Sleeve Assembly for P-38J-15
16-May-1944
T.O. No. 01-75FF-28
|
Modification of Supercharger Deck Assembly for P-38E, P-38F Series, P-38G, F-4, and F-5
26-Nov-1942
T.O. No. 01-75F-74
|
General Servicing Coolant Systems for P-38, F-5, P-40 (except F and L), P-51, P-51A, P-63 and A-36
30-Dec-1944
T.O. No. 01-1-167
|
Installation of Type 0-1 Generator with Blast Cooling and Voltage Regulator Box Air Blast Tube for P-38F, E, F-4, and -4A
25-July-1942
T.O. No. 01-75F-48
|
Modification of I.F.F. Destructor Circuit for P-38, F-4, and F-5 Series
21-July-1943
T.O. No. 01-75F-16
|
Modification of Type PE-218A, B, C, D, and E Inverters
17-Apr-1945
T.O. No. 01-1-226
|
Maintenance and Flight Instructions for P-38 Series
21-April-1942
T.O. No. 01-75F-38
|
Installation of Group A Parts of SCR-535-A for P-38D, E, and F
13-Aug-1943
T.O. No. 01-75F-58
|
Installation of Blast Tube on Lower Left .50 Caliber Machine Gun for P-38 Series
6-June-1943
T.O. No. 01-75F-10
|
Hydraulic Trigger Motor, 20MM Cannon, P-38F-13, P-38F-15, P-38G-15
24-June-1943
T.O. No. 01-75FE-6
|
Modification of Landing Gear Hydraulic Selector Valve for RP-38, RP-38D, RP-38E, P-38F, and P-38G Series
30-July-1944
T.O. No. 01-75F-90
|
Rework of Carburetor Air Filter Intake Elbow Assembly for RP-38
11-Dec-1943
T.O. No. 01-75-44
|
Tail Buffeting for P-38, F-4, F-5, and P-322 Series
23-Mar-1943
T.O. No. 01-75F-21
|
Removal of Air Vapor Eliminator System for RP-38E, F, G, F-4 and -5
15-Sept-1943
T.O. No. 01-75-10
|